ITAC Assessment: UF0148
ITAC logo
ITAC Assessment: UF0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Concrete Pipe
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 150,000
ft2
Annual Production 175,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,076 1,601,407
kWh
Electricity Demand $48,301 5,552
kW-mo/yr
Natural Gas $22,920 5,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,631 $828 $1,910
37,515
kWh
$721
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $499 $660 $499
9,672
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $1,145 $2,649 $728
14,361
kWh
$417
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $371 $500 $371
7,327
kWh
- - - -
05 3.1182: Make a new by-product $5,880 - - - - - $5,880
06 3.2176: Increase use of automation $9,800 $21,000 - - - $9,800 -
07 3.1192: Reduce scrap production $22,500 $18,000 - - $22,500 - -
TOTAL RECOMMENDED $42,826 $43,637 $3,508
68,875
kWh
$1,138
-
kW-mo/yr
$22,500 $9,800 $5,880
TOTAL IMPLEMENTED $4,147 $3,977 $3,009
59,203
kWh
$1,138
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs