ITAC Assessment: UF0147
ITAC logo
ITAC Assessment: UF0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Pipe
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 85,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,373 1,431,125
kWh
Electricity Demand $16,941 4,068
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,558 $334 $1,907
32,239
kWh
$651
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $578 - $420
7,034
kWh
$158
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $1,865 $2,300 $1,394
23,740
kWh
$471
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $1,820 $450 $1,820
30,774
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $496 $500 $496
7,034
kWh
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,681 $8,000 $38,657
655,334
kWh
$4,504
-
kW-mo/yr
$(-18,480.0)
-
MMBtu
-
07 3.6192: Use a less expensive method of waste removal $1,994 - - - - $1,994
TOTAL RECOMMENDED $33,992 $11,584 $44,694
756,155
kWh
$5,784
-
kW-mo/yr
$(-18,480.0)
-
MMBtu
$1,994
TOTAL IMPLEMENTED $7,491 $3,134 $4,217
70,047
kWh
$1,280
-
kW-mo/yr
- $1,994
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs