Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Pipe |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
85,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,373 | 1,431,125 |
kWh
|
$0.060 |
Electricity Demand | $16,941 | 4,068 |
kW-mo/yr
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,491 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,558 | $334 |
$1,907
32,239
kWh
|
$651
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $578 | - |
$420
7,034
kWh
|
$158
-
kW-mo/yr
|
- | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,865 | $2,300 |
$1,394
23,740
kWh
|
$471
-
kW-mo/yr
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $1,820 | $450 |
$1,820
30,774
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $496 | $500 |
$496
7,034
kWh
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $24,681 | $8,000 |
$38,657
655,334
kWh
|
$4,504
-
kW-mo/yr
|
$(-18,480.0)
-
MMBtu
|
- | |
07 | 3.6192: Use a less expensive method of waste removal | $1,994 | - | - | - | - | $1,994 | |
TOTAL RECOMMENDED | $33,992 | $11,584 |
$44,694
756,155
kWh
|
$5,784
-
kW-mo/yr
|
$(-18,480.0)
-
MMBtu
|
$1,994 | ||
TOTAL IMPLEMENTED | $7,491 | $3,134 |
$4,217
70,047
kWh
|
$1,280
-
kW-mo/yr
|
- | $1,994 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs