ITAC Assessment: UF0136
ITAC logo
ITAC Assessment: UF0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automobile Trade Magazine
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $1
M
to 5
M
# of Employees 400
Plant Area 100,000
ft2
Annual Production 208,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,351 3,802,169
kWh
Electricity Demand $35,708 7,724
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,353 $16,873 $14,539
264,361
kWh
$1,814
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $325 $256 $325
6,448
kWh
- - -
03 2.7134: Use photocell controls $282 $540 $282
5,569
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,632 $1,395 $1,352
19,930
kWh
$280
-
kW-mo/yr
- -
05 2.7232: Replace existing hvac unit with high efficiency model $19,928 $16,700 $17,139
302,169
kWh
$2,789
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,493 $1,000 $1,493
24,912
kWh
- - -
07 2.4314: Use synthetic lubricant $497 - $497
8,206
kWh
- - -
08 3.5316: Contract a wood pallet recycling company $487 - - - $487 -
09 3.6192: Use a less expensive method of waste removal $588 - - - $588 -
10 3.8211: Convert to aqueous cleaning system $3,652 - - - - $3,652
TOTAL RECOMMENDED $45,237 $36,764 $35,627
631,595
kWh
$4,883
-
kW-mo/yr
$1,075 $3,652
TOTAL IMPLEMENTED $23,832 $19,635 $20,763
360,786
kWh
$3,069
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs