ITAC Assessment: UF0132
ITAC logo
ITAC Assessment: UF0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Board Assemblies
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 56,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,042 3,952,227
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,637 $32,604 $29,637
517,585
kWh
02 2.7135: Install occupancy sensors $4,087 $192 $4,087
77,081
kWh
03 2.4133: Use most efficient type of electric motors $2,055 $1,094 $2,055
34,877
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,399 $40,610 $14,399
248,242
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,768 $350 $1,768
28,429
kWh
06 2.2622: Replace existing chiller with high efficiency model $7,950 $15,000 $7,950
150,059
kWh
07 2.3137: Use power during off-peak periods $3,802 - $3,802
-
kWh
TOTAL RECOMMENDED $63,698 $89,850 $63,698
1,056,273
kWh
TOTAL IMPLEMENTED $33,460 $34,048 $33,460
580,891
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs