ITAC Assessment: UF0130
ITAC logo
ITAC Assessment: UF0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Metal Lithography
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 62,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,720
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,956 6,509,672
kWh
Natural Gas $366,550 52,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,968 $10,600 $4,968
84,994
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,122 $2,853 $1,122
22,274
kWh
-
03 2.7135: Install occupancy sensors $305 $448 $305
6,155
kWh
-
04 2.7134: Use photocell controls $1,056 $1,200 $1,056
21,102
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,302 $350 $2,302
38,980
kWh
-
06 2.4133: Use most efficient type of electric motors $9,815 $10,658 $9,815
167,057
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $937 $162 $937
18,757
kWh
-
08 2.8114: Change rate schedules or other changes in utility service $54,080 $250,000 - $54,080
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,542 $12,000 $16,542
331,477
kWh
-
10 2.8113: Purchase gas directly from a contract gas supplier $49,911 - - $49,911
11 3.6192: Use a less expensive method of waste removal $29,006 $285,418 - $29,006
TOTAL RECOMMENDED $170,044 $573,689 $37,047
690,796
kWh
$132,997
TOTAL IMPLEMENTED $36,742 $37,823 $36,742
684,641
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs