ITAC Assessment: UF0127
ITAC logo
ITAC Assessment: UF0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aluminum Fuel Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 94,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,743 595,545
kWh
Natural Gas $799 107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,065 - $1,065
20,223
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $457 $935 $457
9,086
kWh
03 2.7232: Replace existing hvac unit with high efficiency model $411 $500 $411
7,620
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $784 $200 $784
14,654
kWh
05 2.4133: Use most efficient type of electric motors $858 $2,485 $858
15,826
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $78 $300 $78
1,758
kWh
07 2.7491: Insulate glazing, walls, ceilings, and roofs $455 $1,450 $455
10,258
kWh
TOTAL RECOMMENDED $4,108 $5,870 $4,108
79,425
kWh
TOTAL IMPLEMENTED $2,717 $1,635 $2,717
51,583
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs