ITAC Assessment: UF0126
ITAC logo
ITAC Assessment: UF0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pine plywood
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area 28,200
ft2
Annual Production 369,375
thousand feet
Production Hrs. Annual 8,520
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,156,491 43,490,915
kWh
LPG $76,682 12,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,822,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,672 $9,944 $2,672
37,222
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,683 $18,125 $11,683
235,053
kWh
- -
03 2.4133: Use most efficient type of electric motors $46,162 $114,584 $46,162
883,646
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $74,087 $149,527 $74,087
1,986,225
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,132 $2,000 $25,132
495,604
kWh
- -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,503,626 $4,550,000 $2,156,491
43,503,225
kWh
$(-1,366,270.0)
-
MMBtu
$713,405
-
MMBtu
07 2.3137: Use power during off-peak periods $72,554 - $72,554
-
kWh
- -
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $86,181 $84,000 - - $86,181
-
MMBtu
TOTAL RECOMMENDED $1,822,097 $4,928,180 $2,388,781
47,140,975
kWh
$(-1,366,270.0)
-
MMBtu
$799,586
-
MMBtu
TOTAL IMPLEMENTED $71,294 $116,584 $71,294
1,379,250
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs