ITAC Assessment: UF0124
ITAC logo
ITAC Assessment: UF0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Capacitors
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,548 3,460,727
kWh
Natural Gas $14,993 3,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,140 $5,883 $2,140
40,739
kWh
- - -
02 2.4133: Use most efficient type of electric motors $4,076 $4,354 $4,076
66,237
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,637 $350 $4,637
74,736
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $222 $700 - $222
-
MMBtu
- -
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,043 - $1,043
14,068
kWh
- - -
06 2.7232: Replace existing hvac unit with high efficiency model $413 $950 $413
7,620
kWh
- - -
07 2.8114: Change rate schedules or other changes in utility service $30,913 $100,000 - - - $30,913
08 3.6192: Use a less expensive method of waste removal $2,700 - - - - $2,700
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,157 $5,000 - - $10,157
-
gal
-
TOTAL RECOMMENDED $56,301 $117,237 $12,309
203,400
kWh
$222
-
MMBtu
$10,157
-
gal
$33,613
TOTAL IMPLEMENTED $14,818 $11,287 $11,896
195,780
kWh
$222
-
MMBtu
- $2,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs