| Assessment Year | 1995 |
|---|---|
| Principal Product | Capacitors |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
70,000
ft2
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,548 | 3,460,727 |
kWh
|
$0.052 |
| Natural Gas | $14,993 | 3,484 |
MMBtu
|
$4.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,818 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,140 | $5,883 |
$2,140
40,739
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $4,076 | $4,354 |
$4,076
66,237
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,637 | $350 |
$4,637
74,736
kWh
|
- | - | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $222 | $700 | - |
$222
-
MMBtu
|
- | - | |
| 05 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,043 | - |
$1,043
14,068
kWh
|
- | - | - | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $413 | $950 |
$413
7,620
kWh
|
- | - | - | |
| 07 | 2.8114: Change rate schedules or other changes in utility service | $30,913 | $100,000 | - | - | - | $30,913 | |
| 08 | 3.6192: Use a less expensive method of waste removal | $2,700 | - | - | - | - | $2,700 | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,157 | $5,000 | - | - |
$10,157
-
gal
|
- | |
| TOTAL RECOMMENDED | $56,301 | $117,237 |
$12,309
203,400
kWh
|
$222
-
MMBtu
|
$10,157
-
gal
|
$33,613 | ||
| TOTAL IMPLEMENTED | $14,818 | $11,287 |
$11,896
195,780
kWh
|
$222
-
MMBtu
|
- | $2,700 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs