Assessment Year | 1995 |
---|---|
Principal Product | Aluminum lids |
NAICS |
n/a
|
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
70,000
ft2
|
Annual Production | 8,200,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,018,005 | 15,916,765 |
kWh
|
$0.064 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,563 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,787 | $7,746 |
$6,787
108,734
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,893 | $1,150 |
$1,893
30,481
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,407 | $14,664 |
$13,407
214,830
kWh
|
|
04 | 2.7135: Install occupancy sensors | $2,210 | $640 |
$2,210
39,566
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $29,665 | $30,154 |
$29,665
468,933
kWh
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,316 | $1,500 |
$6,316
112,837
kWh
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,584 | $50,400 |
$33,584
599,648
kWh
|
|
08 | 2.7232: Replace existing hvac unit with high efficiency model | $208 | $950 |
$208
3,810
kWh
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $374 | $520 |
$374
3,810
kWh
|
|
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,129 | $3,000 |
$10,129
180,832
kWh
|
|
11 | 2.3212: Optimize plant power factor | $2,841 | $12,951 |
$2,841
-
kWh
|
|
TOTAL RECOMMENDED | $107,414 | $123,675 |
$107,414
1,763,481
kWh
|
||
TOTAL IMPLEMENTED | $71,563 | $71,605 |
$71,563
1,129,542
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs