ITAC Assessment: UF0109
ITAC logo
ITAC Assessment: UF0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Grenade Fuses
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 8,000,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 3,960
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,541 3,152,403
kWh
Fuel Oil #2 $3,180 541
MMBtu
Other Gas $73,253 10,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,538 $13,360 $5,538
62,427
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,068 $2,078 $1,068
12,603
kWh
03 2.7135: Install occupancy sensors $341 $256 $341
5,569
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $320 $226
2,638
kWh
05 2.4133: Use most efficient type of electric motors $819 $1,911 $819
9,965
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $434 $500 $434
7,327
kWh
07 2.6242: Minimize operation of equipment maintained in standby condition $10,129 $1,500 $10,129
168,816
kWh
TOTAL RECOMMENDED $18,555 $19,925 $18,555
269,345
kWh
TOTAL IMPLEMENTED $7,859 $17,849 $7,859
92,322
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs