| Assessment Year | 1995 |
|---|---|
| Principal Product | Automobile Parts |
| NAICS |
n/a
|
| SIC | 3492: Fluid Power Valves and Hose Fittings |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
130,000
ft2
|
| Annual Production | 26,000,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $862,458 | 10,968,933 |
kWh
|
$0.079 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $107,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $95,600 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $221 | $160 |
$221
2,638
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,776 | $4,557 |
$13,776
187,573
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $6,471 | $640 |
$6,471
109,613
kWh
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $37,107 | $7,595 |
$37,107
435,815
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $4,516 | $9,616 |
$4,516
57,737
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,073 | $2,000 |
$3,073
38,980
kWh
|
- | - | |
| 07 | 3.1162: Use less wasteful packaging | $5,803 | - | - | - |
$5,803
-
lb
|
|
| 08 | 3.8211: Convert to aqueous cleaning system | $36,907 | $18,000 | - |
$36,907
-
gal
|
- | |
| TOTAL RECOMMENDED | $107,874 | $42,568 |
$65,164
832,356
kWh
|
$36,907
-
gal
|
$5,803
-
lb
|
||
| TOTAL IMPLEMENTED | $95,600 | $41,928 |
$58,693
722,743
kWh
|
$36,907
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs