ITAC Assessment: UF0101
ITAC logo
ITAC Assessment: UF0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Film
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 17
Plant Area 25,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 8,670
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,205 2,669,402
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,006 $327 $2,006
30,481
kWh
-
02 2.7134: Use photocell controls $1,094 $2,400 $1,094
19,930
kWh
-
03 2.4133: Use most efficient type of electric motors $3,879 $5,038 $3,879
59,789
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,260 $1,450 $1,260
19,343
kWh
-
05 4.631: Install an uninteruptable power supply $30,000 $100,000 - $30,000
06 2.2511: Insulate bare equipment $920 $700 $920
16,706
kWh
-
TOTAL RECOMMENDED $39,159 $109,915 $9,159
146,249
kWh
$30,000
TOTAL IMPLEMENTED $7,145 $6,815 $7,145
109,613
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs