ITAC Assessment: UF0100
ITAC logo
ITAC Assessment: UF0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Concrete Roof Tiles
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 2,178,000
ft2
Annual Production 360
thousand feet
Production Hrs. Annual 5,460
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,820 2,510,844
kWh
Other Energy $106,625 22,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,448 $5,894 $5,448
85,287
kWh
-
02 2.7134: Use photocell controls $116 $200 $116
2,638
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $405 $1,000 $405
7,327
kWh
-
04 2.4133: Use most efficient type of electric motors $6,602 $7,601 $6,602
119,578
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,762 $2,425 $1,762
31,946
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $16,000 $7,000 $16,000
291,032
kWh
-
07 2.2449: Recover heat from exhausted steam, hot air or hot water $70,532 $52,995 - $70,532
-
MMBtu
TOTAL RECOMMENDED $100,865 $77,115 $30,333
537,808
kWh
$70,532
-
MMBtu
TOTAL IMPLEMENTED $23,615 $16,319 $23,615
415,592
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs