Assessment Year | 1994 |
---|---|
Principal Product | Automobile Parts |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
144,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,089 | 5,238,863 |
kWh
|
$0.063 |
Other Energy | $15,318 | 3,065 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,375 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $2,917 | - |
$2,917
-
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,389 | $4,359 |
$5,389
88,804
kWh
|
|
03 | 2.7144: Install spectral reflectors / delamp | $621 | $888 |
$621
8,206
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,231 | $17,559 |
$6,231
102,872
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $873 | $3,458 |
$873
13,775
kWh
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,478 | $1,000 |
$4,478
71,219
kWh
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,828 | $10,000 |
$3,828
60,668
kWh
|
|
08 | 2.3112: Store heated/ cooled water for use during peak demand periods | $33,331 | $101,600 |
$33,331
-
kWh
|
|
09 | 2.4133: Use most efficient type of electric motors | $6,666 | $9,238 |
$6,666
105,803
kWh
|
|
TOTAL RECOMMENDED | $64,334 | $148,102 |
$64,334
451,347
kWh
|
||
TOTAL IMPLEMENTED | $17,375 | $27,797 |
$17,375
279,894
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs