ITAC Assessment: UF0097
ITAC logo
ITAC Assessment: UF0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automobile Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 144,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,089 5,238,863
kWh
Other Energy $15,318 3,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3132: Recharge batteries on during off-peak demand periods $2,917 - $2,917
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,389 $4,359 $5,389
88,804
kWh
03 2.7144: Install spectral reflectors / delamp $621 $888 $621
8,206
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,231 $17,559 $6,231
102,872
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $873 $3,458 $873
13,775
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,478 $1,000 $4,478
71,219
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,828 $10,000 $3,828
60,668
kWh
08 2.3112: Store heated/ cooled water for use during peak demand periods $33,331 $101,600 $33,331
-
kWh
09 2.4133: Use most efficient type of electric motors $6,666 $9,238 $6,666
105,803
kWh
TOTAL RECOMMENDED $64,334 $148,102 $64,334
451,347
kWh
TOTAL IMPLEMENTED $17,375 $27,797 $17,375
279,894
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs