| Assessment Year | 1994 |
|---|---|
| Principal Product | Mattresses and Boxsprings |
| NAICS |
n/a
|
| SIC | 2515: Mattresses, Foundations, and Convertible Beds |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
265,000
ft2
|
| Annual Production | 400,000
pieces
|
| Production Hrs. Annual | 5,304
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,638 | 1,664,127 |
kWh
|
$0.060 |
| Other Energy | $1,644 | 15 |
MMBtu
|
$109.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,145 | $687 |
$2,145
35,756
kWh
|
|
| 02 | 2.7135: Install occupancy sensors | $642 | $256 |
$642
12,896
kWh
|
|
| 03 | 2.7144: Install spectral reflectors / delamp | $3,307 | $11,712 |
$3,307
43,083
kWh
|
|
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $5,419 | $1,350 |
$5,419
81,770
kWh
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $440 | $1,045 |
$440
7,327
kWh
|
|
| 06 | 2.7134: Use photocell controls | $2,113 | $2,400 |
$2,113
42,204
kWh
|
|
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $6,412 | $18,200 |
$6,412
106,682
kWh
|
|
| 08 | 2.3132: Recharge batteries on during off-peak demand periods | $961 | - |
$961
-
kWh
|
|
| 09 | 2.7263: Lower compressor pressure through a/c system modification | $1,520 | $3,200 |
$1,520
30,481
kWh
|
|
| 10 | 2.7421: Reduce glazed areas in buildings | $1,516 | $300 |
$1,516
25,205
kWh
|
|
| TOTAL RECOMMENDED | $24,475 | $39,150 |
$24,475
385,404
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs