ITAC Assessment: UF0093
ITAC logo
ITAC Assessment: UF0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Wooden Panels and Tambour
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 44
Plant Area 50,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,404 562,720
kWh
Natural Gas $1,846 286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,824 $990 $1,824
16,706
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,107 $2,459 $1,107
10,258
kWh
03 2.4133: Use most efficient type of electric motors $1,040 $4,519 $1,040
9,672
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,715 $20,100 $6,715
61,841
kWh
05 2.7144: Install spectral reflectors / delamp $1,894 $1,496 $1,894
16,413
kWh
06 2.7135: Install occupancy sensors $917 $64 $917
8,499
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $604 $879 $604
5,569
kWh
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $183 $15 $183
1,758
kWh
TOTAL RECOMMENDED $14,284 $30,522 $14,284
130,716
kWh
TOTAL IMPLEMENTED $4,818 $2,565 $4,818
43,376
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs