ITAC Assessment: UF0085
ITAC logo
ITAC Assessment: UF0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product printed checks
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area 28,000
ft2
Annual Production 166,400,000
pieces
Production Hrs. Annual 6,474
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,588 809,496
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,582 $250 $2,582
36,342
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,229 $511 $3,229
45,428
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,004 $1,899 $1,004
14,068
kWh
04 2.7135: Install occupancy sensors $2,413 $832 $2,413
33,998
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $893 $1,260 $893
12,603
kWh
06 2.7232: Replace existing hvac unit with high efficiency model $5,251 $7,200 $5,251
73,857
kWh
07 2.7241: Install outside air damper / economizer on hvac unit $5,781 $7,200 $5,781
81,477
kWh
08 2.7271: Replace electric reheat with heat pipes $760 $2,400 $760
10,844
kWh
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $718 $400 $718
10,258
kWh
TOTAL RECOMMENDED $22,631 $21,952 $22,631
318,875
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs