ITAC Assessment: UF0083
ITAC logo
ITAC Assessment: UF0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Security System
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 26,600
ft2
Annual Production 0
units
Production Hrs. Annual 4,550
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,896 1,449,004
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,179 $17,575 $16,179
218,640
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $681 $425 $681
9,086
kWh
03 2.7135: Install occupancy sensors $345 $320 $345
4,689
kWh
04 2.7232: Replace existing hvac unit with high efficiency model $8,240 $8,700 $8,240
111,372
kWh
05 2.3111: Heat water during off-peak periods and store for later use $13,781 $55,700 $13,781
-
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,416 $450 $2,416
32,532
kWh
TOTAL RECOMMENDED $41,642 $83,170 $41,642
376,319
kWh
TOTAL IMPLEMENTED $16,860 $18,000 $16,860
227,726
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs