ITAC Assessment: UF0080
ITAC logo
ITAC Assessment: UF0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Polystyrene Cups
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 125,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,214 3,857,855
kWh
Natural Gas $612,434 144,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $9,252 $9,802 $9,252
138,042
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,048 $1,584 $1,048
15,533
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,272 $594 $5,272
78,546
kWh
-
04 2.7135: Install occupancy sensors $1,257 $512 $1,257
21,395
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $147 $200 $147
1,758
kWh
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $180,408 $500,000 - $180,408
TOTAL RECOMMENDED $197,384 $512,692 $16,976
255,274
kWh
$180,408
TOTAL IMPLEMENTED $14,524 $10,396 $14,524
216,588
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs