ITAC Assessment: UF0074
ITAC logo
ITAC Assessment: UF0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PRESTRESSED CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 10,800
ft2
Annual Production 64,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,514 618,113
kWh
Natural Gas $6,638 939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,092 $519 n/a $1,092
17,878
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $458 $2,101 n/a $458
7,620
kWh
-
03 2.7135: Install occupancy sensors $307 $252 n/a $307
4,982
kWh
-
04 2.7134: Use photocell controls $350 $1,200 n/a $350
5,862
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $1,726 - n/a $1,726
28,429
kWh
-
06 2.4133: Use most efficient type of electric motors $1,178 $4,121 n/a $1,178
19,343
kWh
-
07 2.7232: Replace existing hvac unit with high efficiency model $233 $1,000 n/a $233
3,810
kWh
-
08 3.4151: Minimize water usage $8,115 $3,050 n/a $8,115
133,060
kWh
-
09 2.8112: Combine utility meters $226 $475 n/a - $226
-
MMBtu
TOTAL RECOMMENDED $13,685 $12,718 $13,459
220,984
kWh
$226
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs