| Assessment Year | 1993 |
|---|---|
| Principal Product | PRESTRESSED CONCRETE |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
10,800
ft2
|
| Annual Production | 64,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,514 | 618,113 |
kWh
|
$0.061 |
| Natural Gas | $6,638 | 939 |
MMBtu
|
$7.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,092 | $519 | n/a |
$1,092
17,878
kWh
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $458 | $2,101 | n/a |
$458
7,620
kWh
|
- |
| 03 | 2.7135: Install occupancy sensors | $307 | $252 | n/a |
$307
4,982
kWh
|
- |
| 04 | 2.7134: Use photocell controls | $350 | $1,200 | n/a |
$350
5,862
kWh
|
- |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,726 | - | n/a |
$1,726
28,429
kWh
|
- |
| 06 | 2.4133: Use most efficient type of electric motors | $1,178 | $4,121 | n/a |
$1,178
19,343
kWh
|
- |
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $233 | $1,000 | n/a |
$233
3,810
kWh
|
- |
| 08 | 3.4151: Minimize water usage | $8,115 | $3,050 | n/a |
$8,115
133,060
kWh
|
- |
| 09 | 2.8112: Combine utility meters | $226 | $475 | n/a | - |
$226
-
MMBtu
|
| TOTAL RECOMMENDED | $13,685 | $12,718 |
$13,459
220,984
kWh
|
$226
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs