ITAC Assessment: SF0539
ITAC logo
ITAC Assessment: SF0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Tortilla Chips and Fresh Salsa
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 28,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 4,290
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,122 1,000,073
kWh
Electricity Demand $71,153 4,013
kW-mo/yr
Natural Gas $73,826 7,477
MMBtu
TOTAL YEARLY COSTS $315,101
RECOMMENDED SAVINGS* $10,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $862 - $1,702
10,006
kWh
- $(-840.0)
02 2.2511: Insulate bare equipment $856 $1,509 - $856
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,584 $18,239 $7,584
44,585
kWh
- -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $1,211 $6,004 - $1,211
-
MMBtu
-
TOTAL RECOMMENDED $10,513 $25,752 $9,286
54,591
kWh
$2,067
-
MMBtu
$(-840.0)
TOTAL IMPLEMENTED $8,446 $18,239 $9,286
54,591
kWh
- $(-840.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs