Assessment Year | 1993 |
---|---|
Principal Product | Gypsum Wallboard |
NAICS |
n/a
|
SIC | 3275: Gypsum Products |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
500,000
ft2
|
Annual Production | 38,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $758,157 | 11,398,300 |
kWh
|
$0.067 |
Natural Gas | $1,252,538 | 615,017 |
MMBtu
|
$2.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $697,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,794 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $626,778 | $1,320,000 | - | $626,778 | |
02 | 2.4133: Use most efficient type of electric motors | $33,681 | $40,138 |
$33,681
502,638
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $23,794 | $15,169 |
$23,794
355,217
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,517 | $1,550 |
$9,517
142,145
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,173 | $1,156 |
$2,173
32,532
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $306 | $448 |
$306
5,862
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $630 | $1,779 |
$630
9,379
kWh
|
- | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $310 | $1,150 |
$310
4,689
kWh
|
- | |
09 | 2.3212: Optimize plant power factor | $317 | $1,000 |
$317
6,155
kWh
|
- | |
TOTAL RECOMMENDED | $697,506 | $1,382,390 |
$70,728
1,058,617
kWh
|
$626,778 | ||
TOTAL IMPLEMENTED | $36,794 | $44,223 |
$36,794
549,238
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs