ITAC Assessment: UF0060
ITAC logo
ITAC Assessment: UF0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Conversion Vans
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 30,000
ft2
Annual Production 22,000
pieces
Production Hrs. Annual 3,276
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,439 3,119,285
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,244 $46,210 $21,244
287,222
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $719 $2,833 $719
9,672
kWh
03 2.7144: Install spectral reflectors / delamp $11,130 $11,140 $11,130
123,388
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $281 $238 $281
3,810
kWh
05 2.4133: Use most efficient type of electric motors $5,981 $9,710 $5,981
80,891
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,268 $2,250 $6,268
84,701
kWh
07 2.3212: Optimize plant power factor $8,898 $13,975 $8,898
-
kWh
08 2.7232: Replace existing hvac unit with high efficiency model $1,618 $3,700 $1,618
21,981
kWh
TOTAL RECOMMENDED $56,139 $90,056 $56,139
611,665
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs