ITAC Assessment: UF0056
ITAC logo
ITAC Assessment: UF0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Wood I-beams
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 15,000
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 3,900
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,867 1,019,344
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,265

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,372 $350 $1,372
15,240
kWh
02 2.7144: Install spectral reflectors / delamp $560 $1,620 $560
4,689
kWh
03 2.3212: Optimize plant power factor $9,259 $15,000 $9,259
-
kWh
04 2.4133: Use most efficient type of electric motors $3,682 $6,727 $3,682
42,497
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,417 $680 $1,417
15,826
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,758 $6,000 $3,758
41,618
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,794 $1,450 $1,794
19,930
kWh
TOTAL RECOMMENDED $21,842 $31,827 $21,842
139,800
kWh
TOTAL IMPLEMENTED $8,265 $9,207 $8,265
93,493
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings