ITAC Assessment: UF0053
ITAC logo
ITAC Assessment: UF0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Citrus base beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 140,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,139 8,681,419
kWh
Natural Gas $84,641 38,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,533 $3,596 $4,533
93,200
kWh
02 2.7144: Install spectral reflectors / delamp $1,538 $4,770 $1,538
27,550
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $239 $812 $239
4,982
kWh
04 2.7232: Replace existing hvac unit with high efficiency model $374 $565 $374
7,913
kWh
05 2.4133: Use most efficient type of electric motors $12,064 $20,264 $12,064
251,465
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,268 $1,175 $11,268
234,760
kWh
07 2.7491: Insulate glazing, walls, ceilings, and roofs $61,857 $186,150 $61,857
1,288,687
kWh
TOTAL RECOMMENDED $91,873 $217,332 $91,873
1,908,557
kWh
TOTAL IMPLEMENTED $28,478 $26,412 $28,478
592,320
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs