ITAC Assessment: UF0048
ITAC logo
ITAC Assessment: UF0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Wood furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 180,000
ft2
Annual Production 244,000
pieces
Production Hrs. Annual 8,060
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,741 3,618,992
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,828 $824 $2,828
35,463
kWh
02 2.7144: Install spectral reflectors / delamp $8,434 $27,540 $8,434
84,408
kWh
03 2.4133: Use most efficient type of electric motors $10,113 $20,642 $10,113
126,319
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $775 $900 $775
9,672
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $1,680 $1,540 $1,680
21,102
kWh
06 2.4221: Install compressor air intakes in coolest locations $492 $150 $492
6,155
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,212 $50 $1,212
15,240
kWh
TOTAL RECOMMENDED $25,534 $51,646 $25,534
298,359
kWh
TOTAL IMPLEMENTED $14,153 $21,516 $14,153
177,022
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs