ITAC Assessment: UF0039
ITAC logo
ITAC Assessment: UF0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HYDRAULIC HOSES
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 40,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $985,188 16,537,515
kWh
Natural Gas $187,283 40,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,148 $408 $2,148
35,756
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $462 $2,465 $462
7,620
kWh
-
03 2.7144: Install spectral reflectors / delamp $3,902 $12,240 $3,902
65,064
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $22,821 - $22,821
-
kWh
-
05 2.4133: Use most efficient type of electric motors $9,260 $55,871 $9,260
154,455
kWh
-
06 2.7233: Use properly designed and sized hvac equipment $18,660 $105,000 $18,660
310,961
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $11,188 $1,000 - $11,188
-
MMBtu
TOTAL RECOMMENDED $68,441 $176,984 $57,253
573,856
kWh
$11,188
-
MMBtu
TOTAL IMPLEMENTED $34,691 $58,744 $34,691
197,831
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs