ITAC Assessment: LE0157
ITAC logo
ITAC Assessment: LE0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Thick Film Paste, Solder Paste
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 62,500
ft2
Annual Production 100
ton
Production Hrs. Annual 4,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,222 3,382,100
kWh
Electricity Demand $94,520 7,857
kW-mo/yr
Natural Gas $55,542 6,811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.651: Install back-up equipment $125,000 $30,500 - - - $125,000
02 2.6218: Turn off equipment when not in use $4,881 - $3,366
56,000
kWh
$1,515
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $636 $825 $636
10,582
kWh
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $1,858 $6,500 - - $1,858
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,513 - $946
15,736
kWh
$567
-
kW-mo/yr
- -
06 2.7132: Install timers on light switches in little used areas $769 $200 $769
12,800
kWh
- - -
TOTAL RECOMMENDED $134,657 $38,025 $5,717
95,118
kWh
$2,082
-
kW-mo/yr
$1,858
-
MMBtu
$125,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs