ITAC Assessment: UF0022
ITAC logo
ITAC Assessment: UF0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FANS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,803 337,925
kWh
Natural Gas $4,185 656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $869 $259
3,517
kWh
02 2.7144: Install spectral reflectors / delamp $2,035 $5,760 $2,035
26,671
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $24 $1,949 $24
293
kWh
04 2.4133: Use most efficient type of electric motors $214 $2,840 $214
2,931
kWh
05 2.7233: Use properly designed and sized hvac equipment $57 $440 $57
879
kWh
TOTAL RECOMMENDED $2,589 $11,858 $2,589
34,291
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs