ITAC Assessment: UF0019
ITAC logo
ITAC Assessment: UF0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MEN'S DRESS SHIRTS
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 2,100,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,396 873,095
kWh
LPG $55,869 5,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,388 $2,380 $1,388
15,533
kWh
-
02 2.7144: Install spectral reflectors / delamp $13,772 $42,630 $13,772
127,198
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $798 $8,466 $798
9,086
kWh
-
04 2.7233: Use properly designed and sized hvac equipment $16,213 $10,220 $16,213
182,298
kWh
-
05 2.4133: Use most efficient type of electric motors $599 $9,321 $599
6,741
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,174 $2,000 - $3,174
-
MMBtu
07 2.2441: Preheat boiler makeup water with waste process heat $338 $1,500 - $338
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $4,879 $6,854 - $4,879
-
MMBtu
TOTAL RECOMMENDED $41,161 $83,371 $32,770
340,856
kWh
$8,391
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs