ITAC Assessment: UF0016
ITAC logo
ITAC Assessment: UF0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product WORK SHIRTS AND PANTS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $5
M
to 10
M
# of Employees 220
Plant Area
n/a
Annual Production 700,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,693 978,898
kWh
Natural Gas $27,787 4,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,022 $1,895 $1,022
9,379
kWh
-
02 2.7144: Install spectral reflectors / delamp $5,883 $13,275 $5,883
53,927
kWh
-
03 2.4133: Use most efficient type of electric motors $186 $3,965 $186
1,758
kWh
-
04 2.7492: Use proper thickness of insulation on building envelope $2,664 $7,280 $2,664
24,912
kWh
-
05 2.7233: Use properly designed and sized hvac equipment $1,151 $6,110 $1,151
10,551
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,132 $1,000 - $1,132
-
MMBtu
TOTAL RECOMMENDED $12,038 $33,525 $10,906
100,527
kWh
$1,132
-
MMBtu
TOTAL IMPLEMENTED $2,469 $11,075 $1,337
12,309
kWh
$1,132
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs