ITAC Assessment: TT0086
ITAC logo
ITAC Assessment: TT0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Poloyflex Belting
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 85,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,784
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,054 9,075,600
kWh
Electricity Demand $188,765 16,742
kW-mo/yr
Electricity Fees $59,309 -
Natural Gas $289,011 53,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $920 $950 - - $920
-
MMBtu
-
02 2.2625: Chill water to the highest temperature possible $1,061 - $1,061
20,654
kWh
- - -
03 2.4134: Replace electric motor with fossil fuel engine $3,238 $7,500 $2,268
62,809
kWh
$970
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,266 $3,000 $5,022
139,517
kWh
$244
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,497 $9,219 $1,339
37,220
kWh
$871
-
kW-mo/yr
- $287
TOTAL RECOMMENDED $12,982 $20,669 $9,690
260,200
kWh
$2,085
-
kW-mo/yr
$920
-
MMBtu
$287
TOTAL IMPLEMENTED $9,744 $13,169 $7,422
197,391
kWh
$1,115
-
kW-mo/yr
$920
-
MMBtu
$287
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs