ITAC Assessment: UF0014
ITAC logo
ITAC Assessment: UF0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product THERMOMETERS & PROBES
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area
n/a
Annual Production 18,000
pieces
Production Hrs. Annual 2,275
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,422 255,862
kWh
LPG $613 39
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $408 - $408
4,396
kWh
02 2.7144: Install spectral reflectors / delamp $2,525 $8,430 $2,525
24,912
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $67 $265 $67
586
kWh
04 2.7233: Use properly designed and sized hvac equipment $612 $420 $612
6,448
kWh
05 2.7492: Use proper thickness of insulation on building envelope $2,374 $4,180 $2,374
24,912
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $128 $50 $128
1,465
kWh
TOTAL RECOMMENDED $6,114 $13,345 $6,114
62,719
kWh
TOTAL IMPLEMENTED $6,114 $13,345 $6,114
62,719
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs