ITAC Assessment: UF0008
ITAC logo
ITAC Assessment: UF0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SAILBOATS
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,733 1,805,979
kWh
Natural Gas $18,892 3,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,718 - $4,718
46,307
kWh
02 2.7123: Keep lamps and reflectors clean $27,276 - $27,276
269,930
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $137 $569 $137
1,465
kWh
04 2.7233: Use properly designed and sized hvac equipment $5,075 $3,100 $5,075
50,117
kWh
05 2.4239: Eliminate or reduce compressed air usage $4,420 - $4,420
62,134
kWh
06 2.4133: Use most efficient type of electric motors $562 $966 $562
5,569
kWh
TOTAL RECOMMENDED $42,188 $4,635 $42,188
435,522
kWh
TOTAL IMPLEMENTED $42,188 $4,635 $42,188
435,522
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs