ITAC Assessment: UD1145
ITAC logo
ITAC Assessment: UD1145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product community center, local arts
NAICS 813410: Civic and Social Organizations
SIC 8412: Museums and Art Galleries
Sales Range less than $500
k
# of Employees 10
Plant Area 30,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,158 329,533
kWh
Natural Gas $9,435 1,542
MMBtu
Waste Disposal Costs
Water Usage $5,000 270
Tgal
TOTAL YEARLY COSTS $63,593
RECOMMENDED SAVINGS* $59,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,510 $6,000 $1,521
10,194
kWh
$989
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $1,504 $5,000 $551
3,697
kWh
$953
-
MMBtu
03 2.7212: Install or upgrade insulation on hvac distribution systems $1,495 $10,000 $629
4,217
kWh
$866
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,573 $12,500 $2,573
17,251
kWh
-
05 2.9114: Use solar heat to make electricty $51,570 $405,000 $51,570
345,699
kWh
-
TOTAL RECOMMENDED $59,652 $438,500 $56,844
381,058
kWh
$2,808
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs