ITAC Assessment: UD1127
ITAC logo
ITAC Assessment: UD1127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed Steel and Aluminum
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 45
Plant Area 104,000
ft2
Annual Production 77,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,498 501,362
kWh
Electricity Demand $25,191 10,655
kW-mo/yr
Electricity Fees $552 -
Natural Gas $37,534 3,930
MMBtu
Waste Disposal Costs
Water Usage $1,050 82
Tgal
Water Disposal $2,659 55
Tgal
TOTAL YEARLY COSTS $113,484
RECOMMENDED SAVINGS* $22,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $12,399 $3,735 - - $12,399
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $9,974 - $1,262
13,610
kWh
- $8,712
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $482 $828 $420
4,526
kWh
$62
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,855 $4,563 $1,682
18,136
kWh
$62
-
kW-mo/yr
$21,111
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs