ITAC Assessment: UD1104
ITAC logo
ITAC Assessment: UD1104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product book rental
NAICS 519120: Libraries and Archives
SIC 8231: Libraries
Sales Range less than $500
k
# of Employees 25
Plant Area 39,900
ft2
Annual Production 1
units
Production Hrs. Annual 2,964
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,081 322,503
kWh
Natural Gas $13,498 1,580
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $53,580
RECOMMENDED SAVINGS* $13,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7233: Use properly designed and sized hvac equipment $4,586 $21,450 $2,236
18,634
kWh
$2,350
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,258 $5,000 $2,258
18,816
kWh
-
03 2.9114: Use solar heat to make electricty $6,793 $92,400 $6,793
56,605
kWh
-
TOTAL RECOMMENDED $13,637 $118,850 $11,287
94,055
kWh
$2,350
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs