ITAC Assessment: UD1102
ITAC logo
ITAC Assessment: UD1102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aircraft Components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 112,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,564,175 70,790,181
kWh
Electricity Demand $599,324 96,727
kW-mo/yr
Electricity Fees $9,452 -
Natural Gas $1,288,461 360,054
MMBtu
Other Energy $9,007 1
MMBtu
Waste Disposal Costs
Water Usage $559,131 341,829
Tgal
Water Disposal $559,135 341,829
Tgal
TOTAL YEARLY COSTS $8,588,685
RECOMMENDED SAVINGS* $478,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Primary Product Savings
01 2.7233: Use properly designed and sized hvac equipment $52,334 - $47,687
547,500
kWh
$4,647
-
kW-mo/yr
- - - -
02 2.7241: Install outside air damper / economizer on hvac unit $1,107 $2,722 $1,107
12,740
kWh
- - - - -
03 2.2437: Recover waste heat from equipment $798 $1,000 $(-136.0)
(-1,564)
kWh
$(-29.0)
-
kW-mo/yr
$963
-
MMBtu
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,605 $8,161 $56,008
644,515
kWh
$5,597
-
kW-mo/yr
- - - -
05 2.4239: Eliminate or reduce compressed air usage $15,572 $16,800 $15,572
178,779
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,527 $900 $5,036
57,816
kWh
$491
-
kW-mo/yr
- - - -
07 2.4322: Use or replace with energy efficient substitutes $326,496 $385,000 - - $326,496
-
MMBtu
- - -
08 2.3212: Optimize plant power factor $9,007 $30,514 - - - $9,007
-
MMBtu
- -
09 2.7233: Use properly designed and sized hvac equipment $5,671 - $3,998
45,900
kWh
$1,673
-
kW-mo/yr
- - - -
10 2.7135: Install occupancy sensors $148 $449 $104
1,200
kWh
$31
-
kW-mo/yr
- - $8 $5
TOTAL RECOMMENDED $478,265 $445,546 $129,376
1,486,886
kWh
$12,410
-
kW-mo/yr
$327,459
-
MMBtu
$9,007
-
MMBtu
$8 $5
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs