ITAC Assessment: GT0577
ITAC logo
ITAC Assessment: GT0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Auto A/C Dryers
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 30,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,159 244,431
kWh
Electricity Fees $7,084 -
Natural Gas $5,458 916
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $403 $5,380 $403
3,810
kWh
- -
02 2.4133: Use most efficient type of electric motors $160 $8,320 $160
1,465
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $800 $668 $800
7,620
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,450 $600 $2,450
22,860
kWh
- -
05 2.2514: Cover open tanks $2,040 $1,176 - $2,040
-
MMBtu
-
06 3.1191: Change procedures / equipment / operating conditions $2,290 $114 - - $2,290
-
gal
TOTAL RECOMMENDED $8,143 $16,258 $3,813
35,755
kWh
$2,040
-
MMBtu
$2,290
-
gal
TOTAL IMPLEMENTED $7,183 $7,270 $2,853
26,670
kWh
$2,040
-
MMBtu
$2,290
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs