ITAC Assessment: UD1092
ITAC logo
ITAC Assessment: UD1092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 531
Plant Area 595,000
ft2
Annual Production 10,943,632
units
Production Hrs. Annual 5,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $903,776 18,557,688
kWh
Electricity Demand $237,657 31,993
kW-mo/yr
Electricity Fees $3,840 -
Natural Gas $171,448 14,654
MMBtu
Other Gas $176,269 1
MMBtu
Other Energy $40,872 875,486
MMBtu
Waste Disposal Costs
Water Usage $17,769 2,136
Tgal
Water Disposal $17,909 2,136
Tgal
Other Liquid (non-haz) $6,086 1
gal
TOTAL YEARLY COSTS $1,575,626
RECOMMENDED SAVINGS* $133,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Other Energy Savings Water Usage Savings Water Disposal Savings
01 2.6218: Turn off equipment when not in use $26,516 - $25,167
516,785
kWh
- $1,349
-
MMBtu
- - - -
02 3.4111: Use closed cycle process to minimize waste water production $6,755 - - - - - - $3,363
-
Tgal
$3,392
-
Tgal
03 2.7241: Install outside air damper / economizer on hvac unit $16,477 $5,670 $16,477
338,331
kWh
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $60,291 - $10,625
218,179
kWh
$2,315
-
kW-mo/yr
- $43,200
-
MMBtu
$4,151
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $23,052 $34,302 $17,778
365,044
kWh
$4,234
-
kW-mo/yr
- - $1,040
-
MMBtu
- -
TOTAL RECOMMENDED $133,091 $39,972 $70,047
1,438,339
kWh
$6,549
-
kW-mo/yr
$1,349
-
MMBtu
$43,200
-
MMBtu
$5,191
-
MMBtu
$3,363
-
Tgal
$3,392
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs