ITAC Assessment: UD1091
ITAC logo
ITAC Assessment: UD1091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Religious
NAICS 813110: Religious Organizations
SIC 8661: Religious Organizations
Sales Range less than $500
k
# of Employees 3
Plant Area 3,000
ft2
Annual Production 1
units
Production Hrs. Annual 1,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $662 2,543
kWh
Natural Gas $318 61
MMBtu
Other Gas $660 61
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $1,641
RECOMMENDED SAVINGS* $1,841 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings
01 2.9114: Use solar heat to make electricty $793 $5,200 $793
3,050
kWh
- -
02 2.7234: Use heat pump for space conditioning $978 $30,000 - $318
-
MMBtu
$660
-
MMBtu
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $70 $6,000 $13
50
kWh
$57
-
MMBtu
-
TOTAL RECOMMENDED $1,841 $41,200 $806
3,100
kWh
$375
-
MMBtu
$660
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs