ITAC Assessment: UD1085
ITAC logo
ITAC Assessment: UD1085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fabric products
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 129,000
ft2
Annual Production 2,905,229
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,808 5,891,100
kWh
Electricity Demand $229,517 14,481
kW-mo/yr
Electricity Fees $34,100 -
Natural Gas $435,571 78,299
MMBtu
Other Gas $24,501 1
MMBtu
Waste Disposal Costs
Water Usage $16,482 2,328
Tgal
Water Disposal $13,288 2,328
Tgal
Other Liquid (non-haz) $3,639 1
gal
TOTAL YEARLY COSTS $1,047,906
RECOMMENDED SAVINGS* $95,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $6,525 - $6,525
132,080
kWh
- - - - -
02 2.6218: Turn off equipment when not in use $7,415 - $7,415
150,100
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,452 $1,235 $1,009
20,422
kWh
$443
-
kW-mo/yr
- - - -
04 2.4239: Eliminate or reduce compressed air usage $168 $52 $168
3,396
kWh
- - - - -
05 3.4116: Meter recycled water (to reduce sewer charges) $3,170 $760 - - - $3,170
-
Tgal
- -
06 2.6218: Turn off equipment when not in use $58,447 - - - $58,447
-
MMBtu
- - -
07 2.2414: Use waste heat from hot flue gases to preheat $13,159 $20,475 $(-322.0)
(-6,532)
kWh
$(-142.0)
-
kW-mo/yr
$13,623
-
MMBtu
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $4,403 $20,475 $(-239.0)
(-4,840)
kWh
$(-142.0)
-
kW-mo/yr
$4,784
-
MMBtu
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,175 $3,294 $544
11,016
kWh
$349
-
kW-mo/yr
- - $207 $75
TOTAL RECOMMENDED $95,914 $46,291 $15,100
305,642
kWh
$508
-
kW-mo/yr
$76,854
-
MMBtu
$3,170
-
Tgal
$207 $75
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs