Assessment Year | 2024 |
---|---|
Principal Product | Fabric products |
NAICS | 313320: Fabric Coating Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
129,000
ft2
|
Annual Production | 2,905,229
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $290,808 | 5,891,100 |
kWh
|
$0.049 | |
Electricity Demand | $229,517 | 14,481 |
kW-mo/yr
|
$15.85 | |
Electricity Fees | $34,100 | - |
|
- | |
Natural Gas | $435,571 | 78,299 |
MMBtu
|
$5.56 | |
Other Gas | $24,501 | 1 |
MMBtu
|
$24,501.00 | |
Waste Disposal Costs | |||||
Water Usage | $16,482 | 2,328 |
Tgal
|
$7.08 | |
Water Disposal | $13,288 | 2,328 |
Tgal
|
$5.71 | |
Other Liquid (non-haz) | $3,639 | 1 |
gal
|
$3,639.00 | |
TOTAL YEARLY COSTS | $1,047,906 | ||||
RECOMMENDED SAVINGS* | $95,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,525 | - |
$6,525
132,080
kWh
|
- | - | - | - | - | |
02 | 2.6218: Turn off equipment when not in use | $7,415 | - |
$7,415
150,100
kWh
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,452 | $1,235 |
$1,009
20,422
kWh
|
$443
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $168 | $52 |
$168
3,396
kWh
|
- | - | - | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,170 | $760 | - | - | - |
$3,170
-
Tgal
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $58,447 | - | - | - |
$58,447
-
MMBtu
|
- | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $13,159 | $20,475 |
$(-322.0)
(-6,532)
kWh
|
$(-142.0)
-
kW-mo/yr
|
$13,623
-
MMBtu
|
- | - | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $4,403 | $20,475 |
$(-239.0)
(-4,840)
kWh
|
$(-142.0)
-
kW-mo/yr
|
$4,784
-
MMBtu
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,175 | $3,294 |
$544
11,016
kWh
|
$349
-
kW-mo/yr
|
- | - | $207 | $75 | |
TOTAL RECOMMENDED | $95,914 | $46,291 |
$15,100
305,642
kWh
|
$508
-
kW-mo/yr
|
$76,854
-
MMBtu
|
$3,170
-
Tgal
|
$207 | $75 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs