Assessment Year | 1987 |
---|---|
Principal Product | PROCESSED MEATS |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 390 |
Plant Area |
n/a
|
Annual Production | 73,000,000
lb
|
Production Hrs. Annual | 6,960
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $876,993 | 17,181,126 |
kWh
|
$0.051 |
Natural Gas | $291,047 | 91,162 |
MMBtu
|
$3.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,558 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,663 | $35,314 |
$15,663
306,858
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,162 | - | - |
$4,362
-
MMBtu
|
$(-200.0) | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $4,090 | $8,000 | - |
$4,090
-
MMBtu
|
- | |
04 | 2.1123: Install automatic stack damper | $5,647 | $700 | - |
$5,647
-
MMBtu
|
- | |
05 | 2.1222: Install turbulators | $8,520 | $6,627 | - |
$8,520
-
MMBtu
|
- | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $549 | $500 | - |
$549
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,186 | $4,170 |
$3,186
62,427
kWh
|
- | - | |
08 | 2.4312: Improve lubrication practices | $1,376 | $700 |
$1,376
26,964
kWh
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,661 | $300 |
$1,661
32,532
kWh
|
- | - | |
10 | 2.2711: Utilize outside air instead of conditioned air for drying | $19,971 | $15,800 |
$17,907
350,821
kWh
|
$2,064
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $64,825 | $72,111 |
$39,793
779,602
kWh
|
$25,232
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $9,558 | $4,970 |
$4,847
94,959
kWh
|
$4,911
-
MMBtu
|
$(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs