ITAC Assessment: KU0217
ITAC logo
ITAC Assessment: KU0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PROCESSED MEATS
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 390
Plant Area
n/a
Annual Production 73,000,000
lb
Production Hrs. Annual 6,960
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $876,993 17,181,126
kWh
Natural Gas $291,047 91,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,663 $35,314 $15,663
306,858
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,162 - - $4,362
-
MMBtu
$(-200.0)
03 2.2414: Use waste heat from hot flue gases to preheat $4,090 $8,000 - $4,090
-
MMBtu
-
04 2.1123: Install automatic stack damper $5,647 $700 - $5,647
-
MMBtu
-
05 2.1222: Install turbulators $8,520 $6,627 - $8,520
-
MMBtu
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $549 $500 - $549
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,186 $4,170 $3,186
62,427
kWh
- -
08 2.4312: Improve lubrication practices $1,376 $700 $1,376
26,964
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,661 $300 $1,661
32,532
kWh
- -
10 2.2711: Utilize outside air instead of conditioned air for drying $19,971 $15,800 $17,907
350,821
kWh
$2,064
-
MMBtu
-
TOTAL RECOMMENDED $64,825 $72,111 $39,793
779,602
kWh
$25,232
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $9,558 $4,970 $4,847
94,959
kWh
$4,911
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs