ITAC Assessment: SD0620
ITAC logo
ITAC Assessment: SD0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Commercial Office Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $50
M
to 100
M
# of Employees 258
Plant Area 100,000
ft2
Annual Production 35,000
units
Production Hrs. Annual 3,289
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,728 1,302,542
kWh
Electricity Demand $108,613 6,785
kW-mo/yr
TOTAL YEARLY COSTS $164,341
RECOMMENDED SAVINGS* $10,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,249 $18,262 $2,534
59,201
kWh
$3,460
-
kW-mo/yr
$255
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,133 $1,050 $1,268
29,640
kWh
$865
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,884 $40,350 $748
17,483
kWh
$1,136
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,266 $59,662 $4,550
106,324
kWh
$5,461
-
kW-mo/yr
$255
TOTAL IMPLEMENTED $10,266 $59,662 $4,550
106,324
kWh
$5,461
-
kW-mo/yr
$255
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs