ITAC Assessment: AM0085
ITAC logo
ITAC Assessment: AM0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AGRICULTURE MACHINERY
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 22,690
pieces
Production Hrs. Annual 2,265
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,147 1,089,390
kWh
Natural Gas $617 69
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,500 $9,570 $3,110
41,911
kWh
$390
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,530 $7,140 $1,530
48,066
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,330 $960 $1,330
26,671
kWh
-
04 2.8114: Change rate schedules or other changes in utility service $660 - $660
-
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $86 $74 $86
1,172
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $423 - $423
8,499
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $407 $480 $407
8,206
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $400 - $400
7,913
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $240 - $240
4,689
kWh
-
10 2.7121: Utilize daylight whenever possible in lieu of artificial light $210 $200 $210
4,103
kWh
-
11 2.7121: Utilize daylight whenever possible in lieu of artificial light $160 - $160
3,224
kWh
-
TOTAL RECOMMENDED $8,946 $18,424 $8,556
154,454
kWh
$390
TOTAL IMPLEMENTED $8,123 $18,424 $7,733
138,042
kWh
$390
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings