| Assessment Year | 2024 |
|---|---|
| Principal Product | Metal displays |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 63 |
| Plant Area |
105,000
ft2
|
| Annual Production | 411,890
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $41,212 | 885,880 |
kWh
|
$0.047 | |
| Electricity Demand | $58,182 | 3,671 |
kW-mo/yr
|
$15.85 | |
| Electricity Fees | $226 | - |
|
- | |
| Natural Gas | $21,905 | 4,889 |
MMBtu
|
$4.48 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,164 | 1,474 |
Tgal
|
$2.15 | |
| Water Disposal | $3,333 | 1,474 |
Tgal
|
$2.26 | |
| Other Liquid (non-haz) | $487 | 1 |
gal
|
$487.00 | |
| TOTAL YEARLY COSTS | $128,509 | ||||
| RECOMMENDED SAVINGS* | $15,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $13,367 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $808 | $941 |
$808
17,184
kWh
|
- | - | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $165 | - |
$56
1,198
kWh
|
$109
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1114: Limit and control secondary combustion air in furnace | $1,555 | $405 |
$180
3,879
kWh
|
- |
$1,375
-
MMBtu
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $31 | $142 |
$31
652
kWh
|
- | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,018 | $924 |
$1,219
25,201
kWh
|
$799
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,541 | $11,151 |
$3,971
85,388
kWh
|
$2,603
-
kW-mo/yr
|
- | $1,562 | $2,405 | |
| TOTAL RECOMMENDED | $15,118 | $13,562 |
$6,265
133,502
kWh
|
$3,511
-
kW-mo/yr
|
$1,375
-
MMBtu
|
$1,562 | $2,405 | ||
| TOTAL IMPLEMENTED | $13,367 | $13,015 |
$5,998
127,773
kWh
|
$3,402
-
kW-mo/yr
|
- | $1,562 | $2,405 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs