ITAC Assessment: UD1079
ITAC logo
ITAC Assessment: UD1079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Food Manufacturing
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 182,000
ft2
Annual Production 118,362,121
units
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $870,185 12,502,886
kWh
Electricity Demand $214,152 32,425
kW-mo/yr
Electricity Fees $1,493 -
Natural Gas $521,925 119,099
MMBtu
Other Gas $2,574 1
MMBtu
Waste Disposal Costs
Water Usage $254,930 62,449
Tgal
Water Disposal $267,115 41,507
Tgal
Other Liquid (non-haz) $262,895 1
gal
TOTAL YEARLY COSTS $2,395,269
RECOMMENDED SAVINGS* $210,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $338 - - $338
-
kW-mo/yr
- - - -
02 2.7241: Install outside air damper / economizer on hvac unit $25,599 $2,200 $25,599
367,808
kWh
- - - - -
03 2.2113: Repair or replace steam traps $40,904 $6,808 - - $40,904
-
MMBtu
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $20,373 $76,500 $(-5,456.0)
(-78,388)
kWh
$(-709.0)
-
kW-mo/yr
$26,538
-
MMBtu
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $9,667 - - - $9,667
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,311 $1,011 $32,399
465,504
kWh
$5,912
-
kW-mo/yr
- - - -
07 2.4237: Substitute compressed air cooling with water or air cooling $30,626 $96,273 $27,103
389,411
kWh
$3,523
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $42,618 $164,640 $28,351
407,347
kWh
$5,173
-
kW-mo/yr
- - - $9,094
09 2.7135: Install occupancy sensors $2,183 $830 $1,084
15,575
kWh
$197
-
kW-mo/yr
- $431 $471 -
TOTAL RECOMMENDED $210,619 $348,262 $109,080
1,567,257
kWh
$14,434
-
kW-mo/yr
$77,109
-
MMBtu
$431 $471 $9,094
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings