Assessment Year | 2024 |
---|---|
Principal Product | Commercial Screen Printing |
NAICS | 323113: Commercial Screen Printing |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 43 |
Plant Area |
48,990
ft2
|
Annual Production | 58,243,903
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $38,250 | 601,440 |
kWh
|
$0.064 | |
Electricity Demand | $17,190 | 1,669 |
kW-mo/yr
|
$10.30 | |
Electricity Fees | $1,514 | - |
|
- | |
Natural Gas | $68,971 | 9,277 |
MMBtu
|
$7.43 | |
Other Gas | $9,208 | 211 |
MMBtu
|
$43.64 | |
Waste Disposal Costs | |||||
Water Usage | $2,137 | 982 |
Tgal
|
$2.18 | |
Water Disposal | $274 | 127 |
Tgal
|
$2.16 | |
Other Liquid (non-haz) | $504 | 1 |
gal
|
$504.00 | |
TOTAL YEARLY COSTS | $138,048 | ||||
RECOMMENDED SAVINGS* | $726,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $721,543 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,737 | $952 |
$1,318
20,730
kWh
|
$419
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $829 | - |
$629
9,894
kWh
|
$200
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,565 | $2,238 |
$1,744
27,418
kWh
|
$553
-
kW-mo/yr
|
- | $268 | |
04 | 2.4239: Eliminate or reduce compressed air usage | $3,038 | $7,596 |
$2,306
36,257
kWh
|
$732
-
kW-mo/yr
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $712 | - | - | - |
$712
-
MMBtu
|
- | |
06 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $5,142 | $25,000 | - | - |
$5,142
-
MMBtu
|
- | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $712,662 | $195,000 |
$2,152
33,832
kWh
|
- |
$10,142
-
MMBtu
|
$700,368 | |
TOTAL RECOMMENDED | $726,685 | $230,786 |
$8,149
128,131
kWh
|
$1,904
-
kW-mo/yr
|
$15,996
-
MMBtu
|
$700,636 | ||
TOTAL IMPLEMENTED | $721,543 | $205,786 |
$8,149
128,131
kWh
|
$1,904
-
kW-mo/yr
|
$10,854
-
MMBtu
|
$700,636 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs