Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Commercial Screen Printing
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 48,990
ft2
Annual Production 58,243,903
units
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,250 601,440
kWh
Electricity Demand $17,190 1,669
kW-mo/yr
Electricity Fees $1,514 -
Natural Gas $68,971 9,277
MMBtu
Other Gas $9,208 211
MMBtu
Waste Disposal Costs
Water Usage $2,137 982
Tgal
Water Disposal $274 127
Tgal
Other Liquid (non-haz) $504 1
gal
TOTAL YEARLY COSTS $138,048
RECOMMENDED SAVINGS* $726,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $721,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,737 $952 $1,318
20,730
kWh
$419
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $829 - $629
9,894
kWh
$200
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,565 $2,238 $1,744
27,418
kWh
$553
-
kW-mo/yr
- $268
04 2.4239: Eliminate or reduce compressed air usage $3,038 $7,596 $2,306
36,257
kWh
$732
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $712 - - - $712
-
MMBtu
-
06 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $5,142 $25,000 - - $5,142
-
MMBtu
-
07 4.111: Add equipment/ operators to reduce production bottleneck $712,662 $195,000 $2,152
33,832
kWh
- $10,142
-
MMBtu
$700,368
TOTAL RECOMMENDED $726,685 $230,786 $8,149
128,131
kWh
$1,904
-
kW-mo/yr
$15,996
-
MMBtu
$700,636
TOTAL IMPLEMENTED $721,543 $205,786 $8,149
128,131
kWh
$1,904
-
kW-mo/yr
$10,854
-
MMBtu
$700,636
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs