Assessment Year | 2024 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
350,347
ft2
|
Annual Production | 1,864,491
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $187,831 | 3,636,144 |
kWh
|
$0.052 | |
Electricity Demand | $55,779 | 8,428 |
kW-mo/yr
|
$6.62 | |
Electricity Fees | $552 | - |
|
- | |
Natural Gas | $15,201 | 1,370 |
MMBtu
|
$11.10 | |
Other Gas | $2,574 | 1 |
MMBtu
|
$2,574.00 | |
Waste Disposal Costs | |||||
Water Usage | $25,859 | 5,040 |
Tgal
|
$5.13 | |
Water Disposal | $25,142 | 5,040 |
Tgal
|
$4.99 | |
Other Liquid (non-haz) | $300 | 1 |
gal
|
$300.00 | |
TOTAL YEARLY COSTS | $313,238 | ||||
RECOMMENDED SAVINGS* | $81,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $59,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $9,834 | - |
$1,089
21,060
kWh
|
$15,035
-
kW-mo/yr
|
$(-6,290.0)
-
MMBtu
|
- | - | - | - | |
02 | 2.2628: Utilize a less expensive cooling method | $12,621 | $12,700 |
$(-5,101.0)
(-98,673)
kWh
|
$(-895.0)
-
kW-mo/yr
|
- |
$9,437
-
Tgal
|
$9,180
-
Tgal
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,018 | $8,430 |
$1,440
27,857
kWh
|
$253
-
kW-mo/yr
|
- | - | - | $118 | $207 | |
04 | 2.4322: Use or replace with energy efficient substitutes | $24,521 | $7,100,000 |
$20,863
403,534
kWh
|
$3,658
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.9114: Use solar heat to make electricty | $32,977 | $336,971 |
$39,881
771,717
kWh
|
- | - | - | - | $(-6,904.0) | - | |
TOTAL RECOMMENDED | $81,971 | $7,458,101 |
$58,172
1,125,495
kWh
|
$18,051
-
kW-mo/yr
|
$(-6,290.0)
-
MMBtu
|
$9,437
-
Tgal
|
$9,180
-
Tgal
|
$(-6,786.0) | $207 | ||
TOTAL IMPLEMENTED | $59,516 | $7,445,401 |
$62,184
1,203,108
kWh
|
$3,911
-
kW-mo/yr
|
- | - | - | $(-6,786.0) | $207 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs