ITAC Assessment: UD1070
ITAC logo
ITAC Assessment: UD1070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Potato Chips, Corn Chips, and Similar Snacks
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 439
Plant Area 250,000
ft2
Annual Production 99,400,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $745,214 10,828,800
kWh
Electricity Demand $290,070 19,159
kW-mo/yr
Electricity Fees $1,662 -
Natural Gas $1,651,974 343,422
MMBtu
Waste Disposal Costs
Water Usage $27,462 4,470
Tgal
Water Disposal $287,665 61,962
Tgal
Other Liquid (non-haz) $109,230 1
gal
TOTAL YEARLY COSTS $3,113,277
RECOMMENDED SAVINGS* $146,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $5,413 $1,000 - - $5,413
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $22,179 $2,000 $22,179
322,364
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,744 - $19,013
276,347
kWh
$5,731
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,729 $2,893 $1,729
25,135
kWh
- -
05 2.9114: Use solar heat to make electricty $92,634 $704,952 $92,634
1,346,422
kWh
- -
TOTAL RECOMMENDED $146,699 $710,845 $135,555
1,970,268
kWh
$5,731
-
kW-mo/yr
$5,413
-
MMBtu
TOTAL IMPLEMENTED $27,592 $3,000 $22,179
322,364
kWh
- $5,413
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs