Assessment Year | 2024 |
---|---|
Principal Product | Potato Chips, Corn Chips, and Similar Snacks |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $50 M to 100M |
# of Employees | 439 |
Plant Area |
250,000
ft2
|
Annual Production | 99,400,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $745,214 | 10,828,800 |
kWh
|
$0.069 | |
Electricity Demand | $290,070 | 19,159 |
kW-mo/yr
|
$15.14 | |
Electricity Fees | $1,662 | - |
|
- | |
Natural Gas | $1,651,974 | 343,422 |
MMBtu
|
$4.81 | |
Waste Disposal Costs | |||||
Water Usage | $27,462 | 4,470 |
Tgal
|
$6.14 | |
Water Disposal | $287,665 | 61,962 |
Tgal
|
$4.64 | |
Other Liquid (non-haz) | $109,230 | 1 |
gal
|
$109,230.00 | |
TOTAL YEARLY COSTS | $3,113,277 | ||||
RECOMMENDED SAVINGS* | $146,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $27,592 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $5,413 | $1,000 | - | - |
$5,413
-
MMBtu
|
|
02 | 2.7241: Install outside air damper / economizer on hvac unit | $22,179 | $2,000 |
$22,179
322,364
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,744 | - |
$19,013
276,347
kWh
|
$5,731
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,729 | $2,893 |
$1,729
25,135
kWh
|
- | - | |
05 | 2.9114: Use solar heat to make electricty | $92,634 | $704,952 |
$92,634
1,346,422
kWh
|
- | - | |
TOTAL RECOMMENDED | $146,699 | $710,845 |
$135,555
1,970,268
kWh
|
$5,731
-
kW-mo/yr
|
$5,413
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,592 | $3,000 |
$22,179
322,364
kWh
|
- |
$5,413
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs